Our latest Build 11 work session was held during our Spring Work Weekend, April 24-27. Our friends at Mountain Machine Works have completed quartering of the driver wheelsets; they achieved 90.000 +/- 0.002 degrees. They bored the crankpin seats and machined the crankpins. The wheelsets and crankpins have been moved to our shop and we…
WW&F Railway Launches “Finish Coach 9 to the Nines” Campaign which aims to raise $120,000 to complete the construction of its new coach! The new coach 9 is a carefully researched and faithful reconstruction of a car built by Jackson and Sharp in 1894 for the WW&F’s predecessor, the Wiscasset & Quebec Railroad. Painstaking detail…
More gold leaf work this week. Thanks for your continued support and interest in the WW&F!The Coach 9 Team
Our latest Build 11 work session was held on March 25-27. Rick Sisson assisted by Bob Longo and Quentin Bethune fabricated the “fire ring” that we will use to heat the driving wheel tires during installation planned for our Spring Work Weekend. Our design is scaled up from the fire ring we built to install…
Today’s work on the new coach… truck construction by Carlos and Jerry Steinke include forgings for springs… lining and lettering with real gold leaf starting with door panels, and proceeding to the car end. Thanks for your continued support and interest in the WW&F!The Coach 9 Team
Master Carpenter Eric Schade reports: “I spent quite a bit of time researching the details of coach 3 at the Wiscasset, Waterville and Farmington Railway Museum. In order to fully understand those details I have made a number of models.” “As I am a Garden Railroader, I have built a number of scale models of…
Master Carpenter Eric Schade reports: “I wanted to post some photos of Coach 3 which we are using as a guide for building our new coach (9) at the Wiscasset, Waterville and Farmington Railway Museum. The Wiscasset and Quebec Railway had two coaches, a baggage/mail/express combine and a smoking car built for the opening of…
Our latest Build 11 work session was held on February 18 – 20. Brendan Barry and Jason Lamontagne picked up driving wheels, axles and counterweights from Mountain Machine Works in Auburn, Maine and transported them to Millinocket Fabrication and Machine on Tuesday where they were joined by Quentin Bethune and Rick Sisson. Preliminary inspection of…
The WW&F’s latest Build 11 work session was held on January 14 – 16. We’ve completely assembled the lead truck (less springs) and equalizer components, continued to machine small and large components and are closing in on tramming the shoes and wedges. We finally received the clevises which, along with the threaded rod, connect the…
Work continues on windows and interior panels. Thanks for your continued support and interest in the WW&F!The Coach 9 Team
We apologize for the delayed “11th of the month” update for you, our most dedicated Build 11 donors. We switched giving platforms to “Zeffy” which required a few extra days of preparation, but will allow us to more effectively conduct fundraising and ticketing, while saving the museum thousands of dollars in processing fees. Thus, your…
Here’s a video look-back on the progress made on the locomotive during 2024. The crew has been hard at work over the past 12 months and we are inching closer to making a concept into a reality. In 2025 we have ambitious goals. We’ve been challenged to raise $60,000 by an anonymous donor who will…
Here’s a video quick video illustrating the swing motion action of the front pony truck of Locomotive 11. Thank You for Your Support We appreciate all contributions to the Build 11 project – together we are making what was considered an impossible dream a reality. Please consider helping by contributing on our donations page at www.build11.org.…
The WW&F Build 11 volunteers have been as busy as Santa constructing our new steam locomotive! Hark, that’s Harold riveting! Gordon Cook has been making 3-D models of the various components for locomotive 11. Here is a full rendering. Now if Santa could only bring us a big enough 3-D printer, we’d be done with…
Interior woodwork continues with sanding / prepping the clerestory ceiling panels and trim. Thanks for your continued support and interest in the WW&F!The Coach 9 Team
Our latest Build 11 work session was held October 11 -14 coincident with the WW&F Ry Fall Work Weekend. On Saturday, Joe and Jay Monty manned the torches to heat the transverse equalizer so that we could form the “ears” on each end. Rick Sisson, Bill Steussey, Joseph Gilbert, and Joe and Jay drove our…
We’ve been cooking up a brand new steam locomotive! Here we are heating the lead truck equalizer during our Aug 13-15th work session. Gordon Cook, Harold Downey and Rick Sisson again used our flanging machine to form the “ears” at the end of the lead truck equalizer. Harold had prepared the end of the equalizer…
Today, we are pleased to announce a major donation towards the completion of WW&F Locomotive 11, a new-build reconstruction of WW&F no. 7, which was scrapped in the 1930s. Two lifetime fans of the Maine two-footers, Gordon Fay and George Bartholomew, have pledged $15,000 to get the Build 11 project on track for completion. This…
The new coach was brought outside yesterday 8/17 for inspection of the finish + cleaning the wood shop. Eric and Ron noted that the car will receive line and lettering work later this year, followed by two coats of gloss varnish. Thanks to our friends at Epifanes Yacht Coatings for donated products and much guidance for interior…
Our latest Build 11 work session was held July 9 -11, 2024. Gordon Cook, Harold Downey and Rick Sisson spent a great deal of time preparing the main equalizer pedestals for installation. These components are located on the forward frame and support the main equalizers which pivot about a 2” pin. We then turned our…
Build 11 team members Gordon and Rick were working on the locomotive today, so instead of a detailed written progress report, see for yourself how the project is progressing! Learn more and contribute at: www.build11.org Thanks for your continued support and interest in the WW&F!The Build 11 Team
Here is a somewhat tardy report from the Build 11 work session that was held June 8 -11. Quentin Bethune and Gordon Cook heat shrunk the previously machined sleeves onto the second axle on Saturday. Quentin then machined both sleeves on the axle. Both rear truck axles are now ready to receive wheels. On Sunday…
The team building locomotive 11 have been hard at work over the last several days, so a formal work update will be coming soon. Here’s a sneak preview of the accomplishments this month – one of the tender truck wheels being fitted to its axle! Learn more and contribute at: www.build11.org Thanks for your continued…
Our last Build 11 work session was held April 25 – 28 during our Spring Work Weekend. Between sessions Harold Downey has continued working on the rear truck frame – the arch bars and journal boxes have been bolted in. We plan to prime all the components before final assembly. Quentin Bethune brought back the…
A springtime snowstorm did not slow down our progress this month; an abbreviated Build 11 team was back for our April 3-5 work session. Between sessions Harold Downey continued assembly of the rear truck frame. Gordon Cook spent part of the day Wednesday working on locomotive 9’s injector with Roger Whitney and Jason Lamontagne. Later…
The Build 11 team was back for our March 5-7 work session. We had a number of team members working on projects during the March 5-7 work session: Harold Downey and Rick Sisson used our flanger to complete all the bending operations described in the captions. Harold also machined the 180 degree bends to finished dimensions.…
The Build 11 team was back for our February 4-6 work session. Harold Downey, Joe Monty and Rick Sisson completed hot bending the lead truck pedestals using our flanging machine. The shorter bends were performed during the January work session. These components will be machined to ready them for assembly. Meanwhile, Harold finished machining the…
The Build 11 team, after enjoying a holiday break, was back at it again during our January 2-4 work session. Quentin Bethune completed polishing the first rear truck axle journal bearing surfaces using a tool post grinder generously donated by Noah MacAdam. Meanwhile, Gordon Cook, Rick Sisson and Jason Lamontagne completed installation of the lead…
December 2023 Update We have more progress to report during our November 13-15 work session. We accomplished quite a lot during this work session and we’re taking a break in December to enjoy the holidays. But we’ll be back at it in January. Stay tuned for our next update. But first…. WE DID IT!! Our…
Today’s project at the railway was to put the color onto the coach. Yesterday, Ron Ginger put the first brush strokes of paint on. Today, Jason from Epifanes Yacht Coatings offered some professional advice to help us get the best possible finish. We got one coat on about 3/4 of the coach. Some was done…
December 31, 2022: 2022 Goal Exceeded! Thank You. Thank you to our friends, followers, and supporters of the Build 11 Campaign. On January 11, 2022, we set out the most ambitious fundraising goal of the campaign – $70,000. Through your efforts, that goal was exceeded – raising nearly $85,000 (including a $25,000 match from the…
Master Carpenter Eric Schade reports: “I went into the shop today to make hardware for the screen frames on the clerestory of the coach. Each set of two clerestory windows has a frame with screen to keep the cinders and bugs out of the coach when the windows are opened. Steel bolts will be screwed…
December 2021 Update On Nov. 30 and December 1, a four-man crew including Jason Lamontagne, Gordon Cook, Rick Sisson and new volunteer Eric Snyder completed flanging the throat sheet for No. 10. This work included forming the knuckle by hand, using wooden mallets to form the final curve over a die. The flanging machine was…
A short video of Master Carpenter Eric Schade working on the end of Coach 9. Thanks for your continued support and interest in the WW&F!The Coach 9 Team
December 2020 Update There is some great news about the Build No. 11 Project this month. First and foremost, our FundRazr has reached and surpassed its goal of $17,000, thanks many donations from members and friends far and near. Nevertheless, if you want to contribute, you still have about three weeks to do so. We’ll…
Reporter ‘Gman’ writes: “We took a visit over to the Wiscasset Waterville and Farmington railroad to get our calendars and take a closer look at the construction of the new railroad coach built on the same Jackson and Sharp blueprints as original surviving coach number 3. The fit and finish in these building stages is…
The long timbers for the coach arrived at the railway today. We got them settled into the shop…a tight fit until other projects are finished. Thanks for your continued support and interest in the WW&F!The Coach 9 Team
August 2018 Update Harold Downey reports: “I am adding all the details to the top side mold. I thought this would be easier. But many of the edge pieces have 3-D curvature, and I couldn’t just bend them out of thin pieces. For example, here is one of them. I start with a cube that…
November 2017 Update Harold Downey finished the working drawing and bill of material for the base frame. There are four castings needed for the base frame: And since the design needed to be completed in combination with the center pivot, the corresponding female center casting which mounts on the truck. Nearly all of the patterns…